Fenwick CaseworkWall

As of Mon 3 Aug 2026, 06:48

Signed in Ilse Vandermeer

Sample data

The wall

Which stage is the constraint this week, and what do we refuse to start because of it?

Hands-on · Drag a card into another stage, or use its Move menu. Hours, limits and the constraint are all recomputed from where the cards are — nothing on this screen is a stored figure. Your board is kept for this browser tab.

The constraint

Finishing is holding 1.70 weeks.

Against 1.06 at Bench, the next deepest. Derived from hours and capacity rather than nominated, which is why it is allowed to move when you move a card. 51 of the 293 hours on the wall are queued at Finishing, which has 30 of the shop’s 330 hours in a week. 1 card is past its promised install.

Five stages, left to right, in the order the work goes through them

Detailing

3/4

Two, one of them half on site visits

36 h standing · 54 h a week · 0.67 weeks deep

1 free

Leaves when · Shop drawings signed by the client, not merely sent.

  1. 24-118

    due 9 Sep

    Lititz Public Library

    Circulation desk and returns wall

    4 d here · median 611 h left

  2. 24-121

    due 28 Aug

    Hemlock Dental

    Six operatory cabinets

    12 d here · median 66 h left

    AgeingBlocked

    Waiting on the client to sign the drawing set, sent 22 Jul.

  3. 24-124

    due 2 Oct

    Ward & Bell

    Reception and two meeting credenzas

    2 d here · median 619 h left

Cutting

2/3

One on the nest saw and the CNC

36 h standing · 72 h a week · 0.50 weeks deep

1 free

Leaves when · Every part cut, labelled, and on a cart with the job number.

  1. 24-109

    due 21 Aug

    Strasburg Brewing

    Back bar and bottle shelving

    3 d here · median 314 h left

  2. 24-113

    due 4 Sep

    Millersville University

    Studio storage, twelve bays

    1 d here · median 322 h left

Bench

5/5

Four benches

157 h standing · 148 h a week · 1.06 weeks deep

At limit

Leaves when · Carcases assembled, doors hung, hardware in and adjusted.

  1. 24-096

    due 14 Aug

    Hershey Medical Group

    Nurse station, phase two

    9 d here · median 838 h left

  2. 24-101

    due 18 Aug

    Kirkwood Tasting Room

    Bar front and back counter

    6 d here · median 826 h left

  3. 24-104

    due 11 Aug

    Ephrata Family Practice

    Reception desk and file wall

    14 d here · median 831 h left

    AgeingBlocked

    Hinges on back order until 12 Aug. Everything else on it is done.

  4. 24-107

    due 26 Aug

    Blue Ball Fire Company

    Gear lockers, twenty-four

    4 d here · median 844 h left

  5. 24-111

    due 1 Sep

    Quarryville Feed

    Retail counter and till surround

    2 d here · median 818 h left

Finishing

2/2

One booth, one sprayer

51 h standing · 30 h a week · 1.70 weeks deep

ConstraintAt limit

Leaves when · Topcoat cured and inspected under the lamp, not merely dry.

  1. 24-088

    due 7 Aug

    Rohrerstown Optical

    Frame display wall

    11 d here · median 517 h left

  2. 24-092

    due 12 Aug

    Manheim Township Schools

    Science bench tops, four rooms

    7 d here · median 534 h left

Load out

2/3

Whoever is free, plus the driver

13 h standing · 26 h a week · 0.50 weeks deep

1 free

Leaves when · Wrapped, listed against the packing sheet, and on the truck.

  1. 24-079

    due 5 Aug

    Willow Street Veterinary

    Exam room casework

    2 d here · median 24 h left

  2. 24-083

    3 d late

    Conestoga House

    Library shelving, three walls

    6 d here · median 29 h left

    AgeingBlockedLate

    Site not ready. Their electrician has not closed the wall.

Sold, scheduled, and deliberately not started

  1. 24-127

    48 h

    Gap Borough Hall

    Council chamber desk

    Finishing is already holding more than a week of booth time against a two-card limit. Detailing this now buys a card that stands in front of the booth in September.

  2. 24-129

    62 h

    Denver Animal Hospital

    Reception and kennel run doors

    Bench is at five of five. Held until 24-096 ships, which is the only thing that opens a slot.

  3. 24-131

    36 h

    Terre Hill Concrete

    Two site-office fitouts

    Client has not confirmed the second unit. Detailing one of a pair twice costs more than waiting.

Every one of these is work we have been paid a deposit for and could start this morning. Starting it would not make it finish sooner — it would put another card in front of the booth and make everything already on the wall later. The list is here so that refusing is a decision with a name on it rather than a queue nobody admits to.

How the constraint is picked

  1. 1Every card carries the hours still owed to it in the stage it is sitting in, not the hours left on the job.
  2. 2A stage's queue is the sum of those hours. Its capacity is the hours it actually has in a week, after site visits, holidays and cure time.
  3. 3Weeks deep is queue divided by capacity. The deepest stage is the constraint, whatever the card count says.
  4. 4Card counts and limits are still printed, because five small cards and five large ones are the same count and not the same week.
  5. 5Nothing upstream of the constraint may start work that would add to it. That refusal is the held list above, and its Start buttons are real.

Finishing is holding nearly two weeks of booth time behind a two-card limit, and half of what looks like a sprayer's week is a room standing full of something curing that nobody may touch.

Why the count alone was not enough

The old wall was cards and limits, and it said Bench was the problem because Bench always has the most cards. Bench has four benches. It is holding a week and a bit of work and it clears it.

Finishing holds two cards and nearly two weeks, because one of them is four rooms of science bench tops. That was invisible on a board that counted cards, and it is the reason the last three jobs shipped late from a stage nobody was watching.

Drag 24-092, the science bench tops, out of Finishing and watch which stage the constraint lands on. That is the argument, and it is faster to make by moving one card than by reading three paragraphs about it.